Waste Water Treatment Plant

Client: 
Saxlund INTL. LTD

Adey Steel worked closely with its client to deliver two cake storage silos, accompanying support structures, platforms and stair on these high profile waste water treatment plants in the south of England.

The project scope involved the detailed drawing of the silos and steelwork using our specialist inhouse technical services operating on our industry leading BIM compliant 3D modelling software Tekla. The data provided from the 3D modelling offered seamless integration with our CNC machinery allowing fast and accurate processing of the component parts.

The main silo bodies measured 5 metres in diameter and 8 meters in height making full use of extensive working height and door size at our fabrication HQ in Loughborough. The silo bodies were finished with a three coat painting system while the structural elements were galvanised to BS EN 1461 providing suitably long lasting protective coating system for the entire project.

Saxlund INTL. LTD

Adey Steel Ltd have successfully secured another order for a Tubefeeder unit to be used in the ex

Saxlund INTL. LTD

Adey Steel worked closely with its client to deliver two cake storage silos, accompanying support

Vinci

The Queens Medical Centre Tram station is part of the multi million pound Nottingham Express Transport development and offers staff and patients at the hospital a critical transport link...

BKBS

Adey Steel completed the architectural steelwork package for the state of the art Fire and Rescue Headquarters in Birstall, Leicestershire...

Network Rail

Adey Steel were awarded the contract to supply Network Rail with fabricated overhead line electrification (OLE) structures for the Great Western route modernisation (GWRM)...

Careys

Adey Steel were awarded the contract to design, fabricate and install 800 tonnes of façade retention steelwork at the Lots Road Power Station redevelopment project in Chelsea, London...

GJP Marina Developments

Adey Steel Ltd have just completed a 350m long footbridge spanning across a disused Mill Pond in Crawley...

Saxlund

Adey Steel Ltd are coming towards the end of a nine month long project to supply the majority of all steelwork to a leading BioEnergy and materials handling firm Saxlund International, based in Southampton...